钢结构工程监理评估报告

2020-09-03 来源:星星旅游
钢结构工程监理评估报告

本工程主体结构为轻钢结构,采用钢结构骨架形式。在施工过程中,施工单位按照设计要求进行了钢结构制作和安装。监理人员对钢结构制作过程进行了全程监督,对焊接质量、尺寸精度、表面质量等进行了检查,确保了钢结构的质量。钢结构安装过程中,监理人员对接头连接、垂直度、水平度等进行了检查,确保了钢结构的稳定性和安全性。经过验收,钢结构质量合格。

3、其他工程

本工程还包括了屋面防水、外墙保温、门窗安装等其他工程。在施工过程中,施工单位按照设计要求进行了施工,监理人员对施工过程进行了全程监督,对材料、施工工艺、质量等进行了检查,确保了其他工程的质量。经过验收,其他工程质量合格。

四、结论

通过对本工程的质量评估,本监理单位认为,本工程施工质量符合设计要求和相关规范标准,各项工程均符合验收标准,达到了设计要求和使用功能。同时,施工单位和监理单位密切配合,各项工作得以顺利完成。在本工程建设中,监理单位发

挥了重要作用,为保证工程质量和安全起到了积极的监督和管理作用。

This project started in July 2016 and the main structure was completed on August 30.2016.Before n。XXX n drawings。prepare n n design。and conduct safety XXX n and management of the party A and the n unit。XXX of the steel structure。the ning axis。plane closure angle。n of the roof layer columns。concrete n n。and anchor bolt n of the building were rechecked。During the processing and n。a dedicated person was responsible for the pre-assembly and only after passing the n。XXX in this project use 4M24 round steel。and the main structure n of the steel structure uses high-strength large hexagonal head bolts with sub-M20.the secondary ns such as purlins and purlin supports。corner braces。and corner XXX n coating。topcoat。etc。all have XXX。n。and XXX processing。assembly。welding。pre-assembly。fastener n。n。and painting of the XXX sandblasting。rust removal。and anti-XXX were done under the n and management of the n XXX welding seams used have XXX.

The roof is a color steel roof。and the XXX。the XXX firmly attached。and the XXX。After the water test。there is no leakage。The material and XXX unobstructed.

XXX rced concrete。which has been XXX doors and windows open flexibly。XXX。and the XXX firmly installed and has good light n。It has XXXXXX is used。which is XXX。and the XXX elastic paint。which is even。firm。and beautiful。The color of the paint is gray。which matches the color of the XXX.

1.This project is divided into four ns: the XXX。and the visual quality is qualified。The main structure n is evaluated as qualified。and the visual quality is XXX。and the visual quality is qualified。The building roof n is XXX。and the visual quality is qualified.

2.Unit project quality n n: The basic control data of this unit project are basically complete。the structure is safe and reliable。and the XXX。The unit project quality XXX and it is agreed to carry out the n acceptance of the project.

Chief Supervising Engineer: XXX。Ltd.